Incoming POs arrival dates derived — override when a supplier reports a delay
PO-00000148 placed 1 Mar 2026
576 units
lands 17 Jul 2026 · derived from lead time + blackouts
PO-00000151 placed 5 Mar 2026
1,728 units
lands 13 Jul 2026 · derived from lead time + blackouts
PO-00000152 placed 5 Mar 2026
576 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000154 placed 12 Mar 2026
580 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000156 placed 12 Mar 2026
1,440 units
lands 6 Jul 2026 · derived from lead time + blackouts
PO-00000163 placed 31 Mar 2026
432 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000168 placed 28 Apr 2026
1,152 units
lands 2 Aug 2026 · derived from lead time + blackouts
PO-00000169 placed 28 Apr 2026
864 units
lands 5 Aug 2026 · derived from lead time + blackouts
Constraints shaping this plan
MouldHZ-SL-155
Dedicated tooling; batches round to full runs.
ManufacturerHenan Zhongsheng Composite Material Co. Ltd · Henan, China
4 wk manufacture + 4 wk transit — orders land ≈1.8 months after placement.
Minimum order0 units (run 0)
Quantities round up to full runs; MOQ applies to the whole mould run.
Container footprint0.016 m³ · 3.8 kg per unit
Drives container fill (volume + weight). Source: weight:pack / volume:erp.
Unit cost $11.72 AUD — manufactured / ex-factory (55.8 CNY · Henan Zhongsheng Composite Material Co. Ltd). Landed cost is a later phase.