← Products

185P-STD-GRY-2.38

SuperPlinth - 185▯-185*40*2.5 - 2380mm - Grey
Henan Zhongsheng Composite Material Co. LtdMould HZ-PL-1852.38 m longretail185P-STD-GRY-2.38-PK (150)breaches floor Jul 26
On hand
1,009
loose units (packs rolled up)
On order
4,776
open POs in transit
Safety floor
975
z × σ over lead time
Avg forecast
1,548
units / month over horizon
Demand forecast
units / month · shape from history, level from target
2,3814,762Jul 26Aug 26Sep 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 27May 27Jun 27
Projected inventory
closing stock vs safety floor · ▲ container arrives
3,9467,892safety floor 975Jul 26Aug 26Sep 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 27May 27Jun 27
Incoming POs arrival dates derived — override when a supplier reports a delay
PO-00000142 placed 3 Feb 2026
300 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000145 placed 12 Feb 2026
300 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000154 placed 12 Mar 2026
900 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000162 placed 30 Mar 2026
450 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000169 placed 28 Apr 2026
750 units
lands 5 Aug 2026 · derived from lead time + blackouts
PO-00000174 placed 2 Jun 2026
576 units
lands 18 Aug 2026 · derived from lead time + blackouts
PO-00000176 placed 9 Jun 2026
1,500 units
lands 22 Aug 2026 · derived from lead time + blackouts
Constraints shaping this plan
MouldHZ-PL-185
Shared with 185P-STD-GRY-3.16 — orders are sized at the mould-run level and allocated by relative need.
ManufacturerHenan Zhongsheng Composite Material Co. Ltd · Henan, China
4 wk manufacture + 4 wk transit — orders land ≈1.8 months after placement.
Minimum order0 units (run 0)
Quantities round up to full runs; MOQ applies to the whole mould run.
Container footprint0.020 m³ · 6.3 kg per unit
Drives container fill (volume + weight). Source: weight:pack / volume:pack.
Unit cost $15.74 AUD — manufactured / ex-factory (74.97 CNY · Henan Zhongsheng Composite Material Co. Ltd). Landed cost is a later phase.
Planning config
User-owned — ERP fields above are read-only. Changes take effect on the next run.
Container packing needs no per-product config — weight & volume are read from the ERP (with fallbacks) and shown under “Constraints shaping this plan”.