125CP-STD-GRY-2.03

SuperCap - 125C - 125*25*2.5 - 2030mm - Grey
Henan Zhongsheng Composite Material Co. LtdMould HZ-CAP-1252.03 m longretailbreaches floor Jul 26
On hand
383
loose units (packs rolled up)
On order
3,121
open POs in transit
Safety floor
734
z × σ over lead time
Avg forecast
694
units / month over horizon
Demand forecast
units / month · shape from history, level from target
8501,701Jul 26Aug 26Sep 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 27May 27Jun 27
Projected inventory
closing stock vs safety floor · ▲ container arrives
1,7263,453safety floor 734Jul 26Aug 26Sep 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 27May 27Jun 27
Incoming POs arrival dates derived — override when a supplier reports a delay
PO-00000139 placed 28 Jan 2026
414 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000142 placed 3 Feb 2026
130 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000152 placed 5 Mar 2026
200 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000153 placed 9 Mar 2026
75 units
lands 25 Jul 2026 · derived from lead time + blackouts
PO-00000154 placed 12 Mar 2026
200 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000165 placed 12 Apr 2026
400 units
lands 13 Aug 2026 · derived from lead time + blackouts
PO-00000166 placed 13 Apr 2026
144 units
lands 16 Aug 2026 · derived from lead time + blackouts
PO-00000169 placed 28 Apr 2026
200 units
lands 5 Aug 2026 · derived from lead time + blackouts
PO-00000170 placed 11 May 2026
240 units
lands 7 Aug 2026 · derived from lead time + blackouts
PO-00000172 placed 31 May 2026
240 units
lands 8 Aug 2026 · derived from lead time + blackouts
PO-00000173 placed 1 Jun 2026
50 units
lands 15 Aug 2026 · derived from lead time + blackouts
PO-00000175 placed 7 Jun 2026
128 units
lands 19 Aug 2026 · derived from lead time + blackouts
PO-00000176 placed 9 Jun 2026
600 units
lands 22 Aug 2026 · derived from lead time + blackouts
PO-00000179 placed 11 Jun 2026
100 units
lands 2 Aug 2026 · derived from lead time + blackouts
Constraints shaping this plan
MouldHZ-CAP-125
Shared with 125CP-STD-GRY-2.425 — orders are sized at the mould-run level and allocated by relative need.
ManufacturerHenan Zhongsheng Composite Material Co. Ltd · Henan, China
4 wk manufacture + 4 wk transit — orders land ≈1.8 months after placement.
Minimum order0 units (run 0)
Quantities round up to full runs; MOQ applies to the whole mould run.
Container footprint0.005 m³ · 1.7 kg per unit
Drives container fill (volume + weight). Source: weight:erp / volume:erp.
Unit cost $5.97 AUD — manufactured / ex-factory (28.42 CNY · Henan Zhongsheng Composite Material Co. Ltd). Landed cost is a later phase.
Planning config
User-owned — ERP fields above are read-only. Changes take effect on the next run.
Container packing needs no per-product config — weight & volume are read from the ERP (with fallbacks) and shown under “Constraints shaping this plan”.