Incoming POs arrival dates derived — override when a supplier reports a delay
PO-00000128 placed 27 Nov 2025
504 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000139 placed 28 Jan 2026
414 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000142 placed 3 Feb 2026
108 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000153 placed 9 Mar 2026
75 units
lands 25 Jul 2026 · derived from lead time + blackouts
PO-00000154 placed 12 Mar 2026
108 units
lands 30 Jul 2026 · derived from lead time + blackouts
PO-00000162 placed 30 Mar 2026
54 units
lands 10 Jul 2026 · derived from lead time + blackouts
PO-00000166 placed 13 Apr 2026
378 units
lands 16 Aug 2026 · derived from lead time + blackouts
PO-00000169 placed 28 Apr 2026
216 units
lands 5 Aug 2026 · derived from lead time + blackouts
PO-00000170 placed 11 May 2026
162 units
lands 7 Aug 2026 · derived from lead time + blackouts
PO-00000172 placed 31 May 2026
162 units
lands 8 Aug 2026 · derived from lead time + blackouts
PO-00000173 placed 1 Jun 2026
108 units
lands 15 Aug 2026 · derived from lead time + blackouts
Constraints shaping this plan
MouldHZ-PST-120C
Dedicated tooling; batches round to full runs.
ManufacturerHenan Zhongsheng Composite Material Co. Ltd · Henan, China
4 wk manufacture + 4 wk transit — orders land ≈1.8 months after placement.
Minimum order0 units (run 0)
Quantities round up to full runs; MOQ applies to the whole mould run.
Container footprint0.018 m³ · 7.0 kg per unit
Drives container fill (volume + weight). Source: weight:erp / volume:cross. Estimated — add ERP dimensions to sharpen it.
Unit cost $19.91 AUD — manufactured / ex-factory (94.8 CNY · Henan Zhongsheng Composite Material Co. Ltd). Landed cost is a later phase.